Remaining Time: 1 Hour, 27 Minutes, 48 Seconds Question Completion Status: Estion 2 Electric Power Is To Be Produced By Installing A Hydraulic Turbine Generator At A Site 68 M Below The Tree Surface Of A Large Water Reservoir That Can Supply Water Tale Of

匿名用户 最后更新于 2021-12-01 19:31 物理类Physics


Remaining Time: 1 hour, 27 minutes, 48 seconds Question Completion Status: estion 2 Electric power is to be produced by installing a hydraulic turbine generator at a site 68 m below the tree surface of a large water reservoir that can supply water tale of 1590 stody Fouge below) of the mechanical power output of the turbine is 845 kW and the electric power generation in 770 KW Ind the combine tingene for efficiency of this plant ignore the pipes 19.01 m4 Generator Turbine 66754 07200 6859 070544 > Ş msi