The available flow of water is 70 m3/s at 39 melevation. If a hydroelectric plant is to be installed with aturbine efficiency of 0.86 and generator efficiency of 92%, whatmaximum power that the plantcould generate?

匿名用户 最后更新于 2021-12-01 18:49 机械工程Mechanical Engineering

The available flow of water is 70 m3/s at 39 melevation. If a hydroelectric plant is to be installed with aturbine efficiency of 0.86 and generator efficiency of 92%, whatmaximum power that the plantcould generate?

已邀请: