A project is represented by the following diagram: 5 6 A) The expected duration of this project is: (10 Poi B) The critical path for the network shown is: (10 Points)
A project is represented by the following diagram: 5 6 A) The expected duration of this project is: (10 Poi B) The critical path for the network shown is: (10 Points)