For This Multiperiod, Multiproduct Production-inventory Problem. Suppose That We Are Examining T Periods T=1,...,T, And Some N Products I=1,...,N. There Is An Initial Inventory Of Yio That Is Available At Hand For Each Product I=1,...,N. We Need To Princi

For this multiperiod, multiproduct production-inventory problem. Suppose that we are examining T periods t=1,...,T, and some N products i=1,...,N. There is an initial inventory of yio that is available at hand for each product i=1,...,N. We need to principally determine the level of production for each product i=1,...,N during each of the periods t=1,...,T, so as to meet the forecasted demand dit for each product i during each period t when it occurs, at a minimal total cost. To take advantage of varying demands and costs, we are permitted to produce excess quantities to be stored for later use. However, each unit of product i consumes a storage space Si, and incurs a storage cost Cit during period t, for i=1,...,N, t=1,..., T. The total storage space anticipated to be available for these N products during period t is St, t=1,..., T. Furthermore, each unit of product i requires hi hours of labor to produce, where the labor cost per hour when producing a unit of product i during period t is given by lit for i=1,...,N, t=1,...,T. The total number of labor hours available to manufacture these N products during period t is given by Ht. Formulate a linear program to solve this production-inventory control system problem. Clearly specify and explain your decision variables. |

已邀请: