need it urgent and correctly
With the use of a Flexible budget, find out the total cost for the production of 80% and 100% activity on the basis of the following information of xyz itd. Production at 50% Capacity 500 Umts Raw Material Rs 80 per unit Direct Labor Rs. 50 per unit Direct Expenses Rs 15 per unit Factory Expenses Rs 50.000 (50% Fixed Adrustration Expenses R$ 60.000X60% Vanable
没有找到相关结果